Plumbers Crack 4,068 Posted June 28, 2017 Share Posted June 28, 2017 Can't be me..no good at marking screen grabs Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91778 Share on other sites More sharing options...
Greboth 2,721 Posted June 28, 2017 Share Posted June 28, 2017 If we're going to use spawn as the central hub we can dig towards spawn but need to decide exactly where the central hub is going to be to if we are all going to meet up. I also assume all the rails will meet up underground and we will have steps / ladder to the surface? or are we planning for the rails to come to the surface at the central hub? I have a few ideas on design of the central hub though which I can build a mock in creative later to show you. I can screenshot Dynmap when I'm home and start mapping out everyone's houses and rough rail directions. Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91783 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted June 28, 2017 Share Posted June 28, 2017 Mrs P needs the laptop now so that's it for the day. I've done about 280 blocks linear (2200 blocks mined) and found 18 diamonds ! That's about 2.5 hours but I was already on L12 and didn't hit any caves, lava or water...very smooth in fact I need to go about another 134 linear blocks South (1072 blocks to mine) to reach the same Z coord as the spawn. Then, providing I haven't screwed up my orientation, I need go about 280 linear blocks East (2240 mined) to get near the spawn..knowing my luck I'll end up in the middle of the desert!!! There's about a 57 block vertical difference between the tunnel and spawn surface for you to play with. Have you thought about automatic lifts? Or possibly escalators if they do them? Or a scary 45 degree rail car ride!! Let me know how and where you want it terminated, remembering the point I'm currently aiming at is in the middle of the spawn and you might eant it outside. Give me a coordinate if you can Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91785 Share on other sites More sharing options...
Greboth 2,721 Posted June 28, 2017 Share Posted June 28, 2017 Is this right? How about the plcement of the main station? Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91797 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted June 28, 2017 Share Posted June 28, 2017 Wow! Bart's going to be a challenge! Might do him first after I've done the first tunnel Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91799 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted June 28, 2017 Share Posted June 28, 2017 Got any coords for the main station? Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91800 Share on other sites More sharing options...
Sennex 1,903 Posted June 28, 2017 Share Posted June 28, 2017 My suggestion would be to doe it just north of the Nether Portal at spawn. The sand will be easy to remove or flatten. When planning this, think about as few branches as possible. Also think about how to decorate the tunnel. No one wants to sit in a boring as hell tunnel for 20 minutes. Making a tunnel slightly larger allows for decorations and other features to be added. Of course a lot of that can be done afterwards, but it is something to keep in mind Also, don't worry about linking to me Luke 23:34 'And Jesus said, "Father, forgive them, for they don't think it be like it is, but it do." Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91801 Share on other sites More sharing options...
Greboth 2,721 Posted June 28, 2017 Share Posted June 28, 2017 2 hours ago, Plumbers Crack said: Got any coords for the main station? If you aim for; x: -364, z: -19, y: 70. We will have to do some amending at the hub as not everyone can come through the same point but it will get us all in the right area. I'll get to building a station / main hub when I'm next on. Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91806 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted June 29, 2017 Share Posted June 29, 2017 9 hours ago, Sennex said: Also, don't worry about linking to me In this context I prefer to think of you as Mae West than Greta Garbo so let me have the coords to a corner of your site please This may seem strange but at the moment I prefer tunnelling to building, don't know why but there you go....diverting an underground stream and bridging over lava on the access route to L12 was Interesting Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91813 Share on other sites More sharing options...
Greboth 2,721 Posted June 29, 2017 Share Posted June 29, 2017 The more I think about it, the more I think it would best to have the hub on the surface and the rails dropping down to L12 then splitting off to each destination. As it will save having to climb / drop 6 levels and it wont take any more resources to do it this way. @Plumbers Crack Which direction are you coming in to the hub from? so I can orientate the hub the right way round. Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91823 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted June 29, 2017 Share Posted June 29, 2017 34 minutes ago, Greboth said: The more I think about it, the more I think it would best to have the hub on the surface and the rails dropping down to L12 then splitting off to each destination. As it will save having to climb / drop 6 levels and it wont take any more resources to do it this way. @Plumbers Crack Which direction are you coming in to the hub from? so I can orientate the hub the right way round. If you're on L70 and we're coming in on L12 that's a drop/climb of 58 levels if I'm understanding you correctly. I'm coming in on Z -19'ish from X -600'ish heading towards your -364 so I'll start heading up at -410'ish Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91827 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted June 29, 2017 Share Posted June 29, 2017 Well, that's the first tunnel completed! And thanks for bringing me up under a wild bees nest! We're about 100m from the spawn with a hill in the way.....are we running a bus service as well? Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91841 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted June 29, 2017 Share Posted June 29, 2017 Greboth, if you want I'll do you next if you give me the coords Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91844 Share on other sites More sharing options...
BO7H B4RRELS 2,453 Posted June 29, 2017 Share Posted June 29, 2017 Greboth, if you want I'll do you next...Whatever happened to that Out of Context thread? [emoji16]Via the FG App Jason, GazzaGarratt and phil bottle 3 Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91848 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted June 29, 2017 Share Posted June 29, 2017 Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91849 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted June 30, 2017 Share Posted June 30, 2017 Shout out now if you want a subway spur to your place...Crispy says I have a MC problem but that will be eased when D2 beta comes out! In the meantime, feed the beast!! The reason for asking for coords is you wouldn't want me appearing suddenly in the middle of your cherised build, and also I won't do it without you asking as that's not really on Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91878 Share on other sites More sharing options...
Greboth 2,721 Posted June 30, 2017 Share Posted June 30, 2017 15 hours ago, Plumbers Crack said: Greboth, if you want I'll do you next if you give me the coords Thanks for the offer but need to plan out some more of my build before I know where I want the rail line to be. Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-91882 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted July 13, 2017 Share Posted July 13, 2017 Ok my biggest tunnel yet is nearing completion running from ~ X = +983, Z = +1138 to the railhead at X = -364, Z = -19..... yeah, that's a shed load of blocks, even if you don't include the dog legs, rises, dips, etc!! Looking at the advice given by Bart, this tunnel is 7 blocks wide x 3 blocks high What I need to know now is the layout across the tunnel? There shouldn't be a problem with mobs below ground as there are torches on both walls on every other block. I don't know if I go past anyone else's base who may want to use part of the tunnel? Should I come full width to the surface or just 2 or 3 wide? I'm itching to start laying tracks so any advice would be appreciated. Greboth, I know you're going to do the main terminus near the spawn so I'll just put a temporary platform etc there Feedback per-leezz! Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-92492 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted July 14, 2017 Share Posted July 14, 2017 Track laying and testing has started and, I must say, dropping 50+ levels on a 45 degree slope certainly tests your video card and is a lot of fun! Gotta shed load of rail laying to do and redstone torch location over lava lakes is fun! Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-92553 Share on other sites More sharing options...
Greboth 2,721 Posted July 14, 2017 Share Posted July 14, 2017 Due to the new angle you come out the ground the terminus has moved a bit closer to spawn now Once I have finished the basic shape of the station I'll put a path from spawn to the station. If anyone has any suggestions for that station let me know now as it isn't too late to make changes to the design. I'm not sure how many platforms we need but I'll add loads so hopefully we wont run out. There is some badly placed chest (with rails running in to them - oopsie) but they are full on rail, powered rails and redstone torches if anyone wants to start their rail lines off. I've also put my energy condenser in station for now as I need a lot of stuff but open to anyone to use if they need more rail. Plumbers Crack 1 Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-92563 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted July 14, 2017 Share Posted July 14, 2017 Gotta get my link finished before D2 beta drops GazzaGarratt 1 Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-92578 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted July 15, 2017 Share Posted July 15, 2017 I'd say I'm about 65% of the way there now but this last part is the hardest part...over lots of lava...may have to "rise and fall" to span them GazzaGarratt 1 Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-92589 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted July 15, 2017 Share Posted July 15, 2017 Well, that was a bitch of a grind...I didn't appreciate how long that damn tunnel was until I took a minecart ride....5:50 was the run time! Thanks to Greboth for the extra track and tings...nice one bro! Taking a ride could be a good way of making a cuppa without getting kicked for being afk! Come on people, join the system! BO7H B4RRELS 1 Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-92614 Share on other sites More sharing options...
Plumbers Crack 4,068 Posted October 19, 2017 Share Posted October 19, 2017 Oh. My. Word!!!! Just been to have my first real look at Greboth’s railway terminal...all I can say is “class,sir” ...if the communal build is to a similar standard I’ll be well happy Check out the station MC people when you get a chance Greboth GazzaGarratt 1 Thanks to Capn_Underpants for the artwork Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-97581 Share on other sites More sharing options...
GazzaGarratt 11,066 Posted October 20, 2017 Share Posted October 20, 2017 I really need to get my sorry ass on here to check it out. Might try over the weekend, as Hayley is away and I can get the stupid long LAN cable out rather than my shitty WiFi. Where does the track take you? Link to comment https://forevergaming.co.uk/forum/forums/topic/4520-fg-national-rail-system/page/2/#findComment-97605 Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now